Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 42868 |
terrace n2 raceway protection cover instelled |
Mukesh kumar arya , 51009476 |
Subhash chandra , 51009482 |
08/2025 | ||||
| 2 | LCIK - 43884 |
Temporary Jig Base Arrangement for Current Testing in Joyar Tablet Trial |
Kunal Upadhyay , 51010611 |
Anuj Kumar Yadav , 51008899 |
🔹 Before (Current Condition / Problem) During Joyar tablet trial, current test jig base was not available, as all jig bases were sent to vendor for modification. Because of this: Current testing could not be performed Trial completion was at risk Production timeline was getting delayed No immediate alternative was available | 🔹 After (Improvement / Countermeasure) A temporary solution was developed by the team: Checked compatibility with other model jig bases Identified that Sprocom tablet jig base could be used Adjusted Joyar jig with Sprocom base using glue/feviquick (temporary setup) Successfully completed current testing and trial | 04/2026 | ||
| 3 | LCIK - 43899 |
Temporary Antenna Flag System for Aging in Bold N1 5G (EMCP) |
Shyam Singh , 51010637 |
Ravi Prakash Yadav , 51010012 Anil Kumar chaursiya , 51010623 |
Before (Previous Situation) In Bold N1 5G (EMCP), Antenna Flag ON was required before placing the device in Aging This was dependent on a software implementation, which was not yet available Due to this: Devices could not be loaded into Aging Production line had to stop Risk of production delay and output loss | After (Improved Situation) Provided a temporary system to enable Antenna Flag before Aging Ensured devices are properly prepared before entering Aging stage Line can now run smoothly until software solution is implemented No dependency on pending software changes for production continuity | 04/2026 | ||