Kaizen

Back

HOD ok
by : Saba Anwar

KPO: ok
by : Saba Anwar

KPO: ok
by : Saba Anwar

CI: ok
by : Shubham Srivastava

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

At RF sage mostly PC ports get blocked due to which PC was restarted or it get changed. This process of troubleshooting consume more time due to which it impact on production. We have tried by installing the USB hub in OK ports it work as multiple ports and RF PV working fine after doing ports. due to which no loss will occurred.

Before Situation

At RF sage mostly PC ports get blocked due to which PC was restarted or it get changed. This process of troubleshooting consume more time due to which it impact on production.

After Situation

We have tried by installing the USB hub in OK ports it work as multiple ports and RF PV working fine after doing ports. due to which no loss will occurred.

Kaizen Start Date

13-10-2025

Kaizen End Date

13-10-2025

Result

Productivity

Cost Calculation Sheet
Improvement Details