Kaizen

Back

HOD OK
by : Sanjeev Bhardwaj

KPO: ok
by : Jai Prakash Singh

CI: ok
by : Shubham Srivastava

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

There is a huge difference between the running stage (800 LUX) & Hold SFG area Stage LUX level(550 LUX) , So That not catch visual defect by naked eyes.

Before Situation

We have found hold SFG clearance stage LUX Level is too low(550 LUX) comparison to Running stage due to this Visual failure bounce is so ho high.

After Situation

By equally the LUX level(800 LUX) then controlled of high rejection.

Kaizen Start Date

19-09-2025

Kaizen End Date

26-09-2025

Result

Productivity

Cost Calculation Sheet
Improvement Details