Kaizen

Back

HOD ok
by : Sachin Rana

KPO: ok
by :

CI: ok
by : Shubham Srivastava

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

In model A1 Josh Bol due to dust issue resolved by modified the router jig. Due to this no dust coming in pcba.

Before Situation

Before At pcba cutting point position router jig area was empty due to this at running time dust come on pcb.

After Situation

Now we modified the router jig at cutting point area position closed. which no dust coming on pcb.

Kaizen Start Date

22-09-2025

Kaizen End Date

25-09-2025

Result

Productivity

Cost Calculation Sheet
Improvement Details