Kaizen

Back

HOD ok
by : Satyapal Singh

KPO: ok
by : Saba Anwar

CI: ok
by : Shubham Srivastava

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

We used two pc with one Lite point tester.

Before Situation

Earlier we are using two dut in one pc due to this tool hanging issue was observed frequently at rf stage in blaze Dragon Models.

After Situation

Now we have used one dut in one pc with one lite point tester after doing this tool hanging issue reduced at some extent now we are using two PC for two dut with One Lite point.

Kaizen Start Date

22-09-2025

Kaizen End Date

22-09-2025

Result

Productivity

Cost Calculation Sheet
Improvement Details