Kaizen

Back

HOD Good Kaizen
by : Harish Chandra Fuloriya

KPO: Good kaizen
by : Praveen kumar

CI: ok
by : Shubham Srivastava

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

Problem Statement with Present Status : Excessive dust (>40 lakhs) on the shop floor was negatively impacting product quality, process reliability, and customer satisfaction. Dust accumulation during sensitive processes (e.g., camera installation and soldering) caused defects, rework, and increased maintenance costs. The existing dust control measures (small air shower) were insufficient and ineffective. Present Status - Dust levels recorded over 40 lakhs (extremely high). Impact on quality – defects during soldering, reduced reliability of camera installations. Existing small air shower ineffective. Dust accumulation visible during key processes. No effective dust monitoring or preventive cleaning system.

Before Situation

High dust levels: Dust levels were over 40 lakhs on the floor, which is extremely high. Impact on product quality: The high dust levels were affecting the quality of your products. Dust accumulation during camera installation: Dust particles were accumulating during camera installation, which could have affected the camera's performance. Insufficient air shower: Although a small air shower was installed earlier, it was not effective in controlling dust levels. Dust appearance during soldering: Dust was

After Situation

50% reduction in dust levels: A significant improvement in air quality and cleanliness by taking proactive measures (Please refer below image as result) Tunnel air shower (L-shaped) installation: Effective in removing dust and other particles from personnel and equipment on movement from floor. Slipper-cleaning machine installation: Helps to prevent dust and dirt from entering the facility. Duct cleaning: Duct cleaning schedule has been changed from annually to monthly. Continuously monitor dust levels: Daily monitoring of dust levels to ensure they remain within acceptable limits. Maintain equipment: Regularly maintain the L-shaped air shower and slipper-cleaning machine to ensure optimal performance. Employee training: Educate employees on the importance of dust control and proper use of equipment

Kaizen Start Date

04-10-2024

Kaizen End Date

13-05-2025

Result

Quality

Cost Calculation Sheet
Improvement Details