Kaizen

Back

HOD ok
by : Jai Prakash Singh

KPO: ok
by : Jai Prakash Singh

CI: ok
by : Shubham Srivastava

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

Loopback test chamber is not yet installed on the third floor due to which there is a possibility of line speaker crack bypass.

Before Situation

Loopback test chamber is not yet installed on the third floor due to which there is a possibility of line speaker crack bypass.

After Situation

Now loopback test chamber is available on third floor each line . For doing this problem has solved .

Kaizen Start Date

15-07-2025

Kaizen End Date

16-07-2025

Result

Quality

Cost Calculation Sheet
Improvement Details