Kaizen

Back

HOD ok
by : Jai Prakash Singh

KPO: ok
by : Jai Prakash Singh

CI: ok
by : Shubham Srivastava

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

Model YUVA 2 5G was running in assembly line on last time. no any checkpoint of SMT calibration by pass in assembly line from testing side, so OQA team found SMT calibration bypass, due to this oqa team stop the line.

Before Situation

Model YUVA 2 5G was running in assembly line on last time. no any checkpoint of SMT calibration by pass in assembly line from testing side, so OQA team found SMT calibration bypass, due to this oqa team stop the line.

After Situation

As per quality and production requirement we have discussed with vendor and added checkpoint sequence in tool. SMT calibration checkpoint added at RF stage. also we have checked SMT calibration bypass devices. at the stage tool working fine.

Kaizen Start Date

30-05-2025

Kaizen End Date

31-05-2025

Result

Quality

Cost Calculation Sheet
Improvement Details