Kaizen Theme
Kaizen Description

Before we were facing BTB connector shifting issue intermittently at Post AOI in model Yuva_Star_2_Main board. after analysis we found part doing issue with 1002 nozzle in Mounter-7 with two Nozzle head and no pre detection of this part. Now we move this part in Mounter-6 with 158 rubber pad nozzle before Pre AOI machine. after this implement no issue observed.

Before Situation

Before we were facing BTB connector shifting issue intermittently at Post AOI in model Yuva_Star_2_Main board.

After Situation

after analysis we found part doing issue with 1002 nozzle in Mounter-7 with two Nozzle head and no pre detection of this part. Now we move this part in Mounter-6 with 158 rubber pad nozzle before Pre AOI machine. after this implement no issue observed.

Kaizen Start Date

15-05-2025

Kaizen End Date

25-05-2025

Result

Quality

Cost Calculation Sheet
Improvement Details