Kaizen

Back

HOD ok
by : Barjinder kumar

KPO: ok
by : Barjinder kumar

CI: ok
by : Shubham Srivastava

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

During Earphone test pass and Fail popup option showing with delay of 3.07 after Earphone plugin in device, Which was leading the bottle neck at the time of production. We raised the issue with respective ODM S/W team and optimized the Headphone test parameters pass and fail popup showing at same time After headphones plugin in device, after this feature no any cycle time issue's face on production line.

Before Situation

During Earphone test pass and Fail popup option showing with delay of 3.07 after Earphone plugin in device, Which was leading the bottle neck at the time of production.

After Situation

We raised the issue with respective ODM S/W team and optimized the Headphone test parameters pass and fail popup showing at same time After headphones plugin in device, after this feature no any cycle time issue's face on production line.

Kaizen Start Date

01-04-2025

Kaizen End Date

05-05-2025

Result

Productivity

Cost Calculation Sheet
Improvement Details