Kaizen

Back

HOD Quality Imporve hence it is very good kaize
by : Satyapal Singh

KPO: ok
by : Saba Anwar

CI: ok
by : Shubham Srivastava

CI: ok
by : Shubham Srivastava

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

SMT cailibration check point added at RF stage in mode Yuva 2 5G OQA team found SMT calibration fail at OQA 1 stage. due to this issue OQA team do stop the line and hold the FG

Before Situation

Model YUVA 2 5G was running in assembly line on last time. no any checkpoint of SMT cailibration by pass in assembly line from testing side, so OQA team found SMT cailibration bypass, due to this oqa team stop the line

After Situation

As per quality and production requirment we have discussed with vendor and added checkpoint sequence in tool. SMT calibration checkpoint added at RF stage. also we have cheked SMT calibration bypass devices. at the stage tool working fine.

Kaizen Start Date

29-04-2025

Kaizen End Date

29-04-2025

Result

Quality

Cost Calculation Sheet
Improvement Details