Kaizen

Back

HOD ok
by : Jai Prakash Singh

KPO: ok
by : Jai Prakash Singh

CI: ok
by : Abhishek Chauhan

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

Loopback test chamber is not yet installed on the third floor due to which there is a possibility of line speaker crack bypass.

Before Situation

Loopback test chamber is not yet installed on the third floor due to which there is a possibility of line speaker crack bypass.

After Situation

Loopback chamber is used to do loopback tests on 1st floor. If loopback test chamber is also installed on 3rd floor then the operator will not have any problem with the sound coming from the tab line or it will easily cause failure like Speaker's creak voice and Speaker's low. You will be able to check.

Kaizen Start Date

11-03-2025

Kaizen End Date

12-03-2025

Result

Quality

Cost Calculation Sheet
Improvement Details