Kaizen
Back
During Kitting we will use the reservation paper use of materials parts code and required qty of production plan
we will use A4 size paper use of kitting .issue to materials to materials control team
after we will developed the reports and see the with device of required reservation materials and required the qty. also we will save the A4 size paper
08-02-2025
10-02-2025
Delivery
HOD okby : Bijendra Singh Bhati
KPO: okby : Suresh chand
CI: okby : Abhishek Chauhan