Kaizen

Back

HOD ok
by : Jai Prakash Singh

KPO: ok
by : Jai Prakash Singh

CI: ok
by : Abhishek Chauhan

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

Earlier we were facing high failure related to Dry soldering at location CPU (U400),In model - Blaze X MB.

Before Situation

Earlier we were facing high failure related to Dry soldering at location CPU (U400),In model - Blaze X MB.

After Situation

Now we have modified the stencil at the CPU location for increase the Solder to reduce the Dry soldering failure. Model -Blaze X MB.

Kaizen Start Date

22-01-2025

Kaizen End Date

23-01-2025

Result

Quality

Cost Calculation Sheet
Improvement Details