Kaizen Description

A single core wire of 1.5 sqm was laid in the underground circuit, the wire was broken at many places, thus causing tripping problem.

Before Situation

A single core wire of 1.5 sqm was laid in the underground circuit, the wire was broken at many places, thus causing tripping problem.

After Situation

we have laid 2.5 Sqmm 3 Copper flexible cable in the circuit. And tripping problem has been resolved now circuit is healthy condition. This is done by with the help of related department.

Kaizen Start Date

15-01-2025

Kaizen End Date

16-01-2025

Result