Kaizen

Back

HOD Ok
by : Ankur Sharma

KPO: Approved
by : Jyoti Prasad Mallick

CI: OK
by :

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

Machine Mode change for A3 TORCH M at SPI machine.

Before Situation

In SPI machine ,Due to large panel size of model A3 TORCH M machine conveyor belt getting remove frequently so belt getting damage and line stop. so unwanted loss coming on line.

After Situation

Now we change machine running mode from fast to standard and slow down loading and unloading speed after that board running smoothly and no any belt removal case found on line. so production running continuously.

Kaizen Start Date

10-12-2024

Kaizen End Date

23-12-2024

Result

Productivity

Cost Calculation Sheet
Improvement Details