Kaizen Theme
Kaizen Description

At RF sage mostly PC ports get blocked due to which PC was restarted or it get changed. This process of troubleshooting consume more time due to which it impact on production.

Before Situation

At RF sage mostly PC ports get blocked due to which PC was restarted or it get changed. This process of troubleshooting consume more time due to which it impact on production.

After Situation

We have tried by installing the USB hub in OK ports it work as multiple ports and RF PV working fine after doing ports. due to which no loss will occurred.

Kaizen Start Date

08-11-2024

Kaizen End Date

09-11-2024

Result

Quality

Cost Calculation Sheet
Improvement Details