Loopback test chamber is not yet installed on the third floor due to which there is a possibility of line speaker crack bypass

Before Situation

Loopback test chamber is not yet installed on the third floor due to which there is a possibility of line speaker crack bypass

After Situation

Loopback chamber is used to do loopback tests on 1st floor. If loopback test chamber is also installed on 3rd floor then the operator will not have any problem with the sound coming from the tab line or it will easily cause failure like Speaker's creak voice and Speaker's low. You will be able to check

Kaizen Start Date

06-11-2024

Kaizen End Date

07-11-2024

Result