Kaizen Theme
Kaizen Description

Repair team decide that part is vendor rejection or sometime issue then vendor how decide its not a fault and part left on the once again in line. When run on line this part then its rejection once again found in repair so hampered the line for same issue repeated.

Before Situation

Repair team decide that part is vendor rejection or sometime issue then vendor how decide its not a fault and part left on the once again in line. When run on line this part then its rejection once again found in repair so hampered the line for same issue repeated.

After Situation

If its validated properly after that run with proper analysis then safe to line losses and not hampered the line.

Kaizen Start Date

24-09-2024

Kaizen End Date

25-09-2024

Result

Quality