Kaizen

Back

HOD ok
by : Sunil kumar

KPO: ok
by : Jai Prakash Singh

CI: ok
by :

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

Before Situation

MRN kit PCBA only Verified by Production & Repair team check all A Class Material than handover to MC. BUT we have checked only physical condition if we have checked physical with binding condition by help of testing any system S\W updated for cross validation. ( by scanning status show about PCBA Binding Status).Then we have control this type problem of running line.

After Situation

We have control the problem of running line.

Kaizen Start Date

12-07-2024

Kaizen End Date

22-07-2024

Result

Productivity

Cost Calculation Sheet
Improvement Details