Implement of SOP no. 24.1 Stage of Charging Current test for Saving Scrap & USb Data Cable.

Before Situation

When operator doing current check test time connecting the Data cable with USB in Sub PCBA That time he pressed the sub PCBA by hand near Rf antenna as per full flash time usually more then chance of SUB PCBA scrap. (Already 2 Sub PCBA Scrap found at same location at NPI Model)

After Situation

IF we have do the modify the jig and use as per Main PCBA POKA Pin on SUB PCBA then we have saving two type of First SUB PCBA scrap & second usb cable. Already all Senior's Appreciate my Suggestion. ( Saurabh Sir, Sanjeev Sir, Sanjay Rupani, Laurance )

Kaizen Start Date

24-07-2024

Kaizen End Date

24-07-2024

Result

Productivity

Cost Calculation Sheet
Improvement Details