Kaizen

Back

HOD ok
by : Rohit dwivedi

KPO: Approved
by : Jyoti Prasad Mallick

CI: ok
by :

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

Reduce Dry soldering failure to modified the stencil.

Before Situation

Earlier we were facing high failure related to Dry soldering at location CPU (U400),In model - Blaze X MB.

After Situation

Now we have modified the stencil at the CPU location for increase the Solder to reduce the Dry soldering failure. Model -Blaze X MB

Kaizen Start Date

16-07-2024

Kaizen End Date

19-07-2024

Result

Quality

Cost Calculation Sheet
Improvement Details