Kaizen

Back

HOD Approve
by : Ankur Sharma

KPO: Approved
by : Jyoti Prasad Mallick

CI: Ok, Kaizen implemented.
by : Aman sharma

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

In model Yuva_5G we were facing location C2229 and D2200 shorting issue during reflow process after analysis we have found both placement was near one another due to this capacitor was shorting with diode during reflow process. After given offset in Location C2229 and also modified same location in Stencil now no any shorting issue found in testing line.

Before Situation

In model Yuva_5G we were facing location C2229 and D2200 shorting issue during reflow process after analysis we have found both placement was near one another due to this capacitor was shorting with diode during reflow process.

After Situation

After given offset in Location C2229 and also modified same location in Stencil now no any shorting issue found in testing line.

Kaizen Start Date

10-06-2024

Kaizen End Date

20-06-2024

Result

Quality

Cost Calculation Sheet
Improvement Details