Kaizen

Back

HOD ok
by : Sunil kumar

KPO: ok
by : Jai Prakash Singh

CI: ok
by :

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

use loop back chamber on 3rd floor

Before Situation

Loopback test chamber is not yet installed on the third floor due to which there is a possibility of line speaker crack bypass

After Situation

Loopback chamber is used to do loopback tests on 1st floor. If loopback test chamber is also installed on 3rd floor then the operator will not have any problem with the sound coming from the tab line or it will easily cause failure like Speaker's creak voice and Speaker's low. You will be able to check.

Kaizen Start Date

03-06-2024

Kaizen End Date

06-06-2024

Result

Productivity

Cost Calculation Sheet
Improvement Details