In model- Yuva 5G , Occurring the failure of key-hard , cause- for this glue on power key.

Before Situation

In Model - Yuva 5G, there was no any checkpoint given at FVI to detect such insider defects which are getting found by tilting at a certain angle, that is why not detected at FVI.

After Situation

PCR has been raised to add an additional checkpoint at FVI to check the key area for further detection by tilting the devices at a certain angle.

Kaizen Start Date

23-05-2024

Kaizen End Date

30-05-2024

Result