Kaizen

Back

HOD OK
by : Dhruv

KPO: OK
by : Dhruv

CI: ok
by :

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

In model- Yuva 5G. As Volume key hard issue was identified in OQA sampling due to improper alignment Fpc got shifted from their position as checked process was not defined in SOP of volume key pasting which lead to generate key hard issue.

Before Situation

As verified process not defined in SOP for volume key pasting process due to which it was occurred.

After Situation

>> One process defined in SOP “to align the side key Fpc from both side of marked area on TP. >> Special SSI checkpoint has been implemented at Receiver pasting stage “ To check side key should be paste on greed line, its should not overlapped over greed line

Kaizen Start Date

22-05-2024

Kaizen End Date

28-05-2024

Result

Quality

Cost Calculation Sheet
Improvement Details