Kaizen

Back

HOD OK
by : Sanjeev Bhardwaj

KPO: ok
by : Jai Prakash Singh

CI: ok
by : Aman sharma

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

If we have done the use PCBA MRN then we have checked only physical condition if we have checked physical with binding condition and status of QSR then we have control the problem of running line.

Before Situation

MRN kit PCBA only Verified by Production & Repair team check all A Class Material than handover to MC. BUT we have checked only physical condition if we have checked physical with binding condition by help of testing any system S\W updated for cross validation. ( by scanning status show about PCBA Binding Status).Then we have control this type problem of running line.

After Situation

We have control the problem of running line.

Kaizen Start Date

16-05-2024

Kaizen End Date

18-05-2024

Result

Productivity

Cost Calculation Sheet
Improvement Details