Kaizen

Back

HOD ok
by : Sachin Rana

KPO: ok
by :

CI: ok
by :

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

emergency switch of the reflow machine has no cover, it keeps turning on frequently and the chances of accidental drowning are high, so I installed a cover which is now safe.

Before Situation

Emergency switch nude of reflow machine

After Situation

We are installed a cover of reflow machine now safe.

Kaizen Start Date

04-04-2024

Kaizen End Date

11-04-2024

Result

Safety

Cost Calculation Sheet
Improvement Details