Kaizen Description

In Blaze 5G,At Heat dissipation paste stage mention in SOP Precaution that after paste BB heat dissipation tape Operator will keep the PCBA on conveyor antenna upward Direction but PCBA not running on Conveyor.

Before Situation

In Blaze 5G,At Heat dissipation paste stage mention in SOP Precaution that after paste BB heat dissipation tape Operator will keep the PCBA on conveyor antenna upward Direction due to which Process split issue making by Auditor.

After Situation

After this Corrected that Operator will keep the PCBA at next stage PCBA antenna upward direction.

Kaizen Start Date

18-09-2023

Kaizen End Date

18-09-2023

Result

Quality

Cost Calculation Sheet
Improvement Details