Kaizen

Back

HOD ok
by : Manoj Kumar Satyawali

KPO: ok
by : Manoj Kumar Satyawali

CI: OK
by :

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

we have installed MPCB according to sump pump rating and sump pump is save.

Before Situation

2 pole 16 A MCB was installed in the sump pump circuit. therefore pump was frequently burnt problem was coming.

After Situation

We have installed MPCB as per sump pump rating and sump pump is safe. If there is any abnormality in the pump then the MPCB will trip.

Kaizen Start Date

06-08-2023

Kaizen End Date

06-08-2023

Result

Moral

Cost Calculation Sheet
Improvement Details