Kaizen

Back

HOD ok
by : Tilak

KPO: ok
by : Jai Prakash Singh

CI: ok
by :

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

The Lava Blaze 2 model did not have a flash light check point at the FVI stage of the line. Due to which the flash light could have been missed in the market by mistake.

Before Situation

The Lava Blaze 2 model did not have a flash light check point at the FVI stage of the line. Due to which the flash light could have been missed in the market by mistake.

After Situation

Now we have added a check point of flash light on the FVI stage on the line of antenna pasting.

Kaizen Start Date

15-04-2023

Kaizen End Date

15-04-2023

Result

Quality

Cost Calculation Sheet
Improvement Details