Kaizen

Back

HOD ok
by : Manoj Kumar Satyawali

KPO: ok
by : Manoj Kumar Satyawali

CI: ok
by : utkersh mishra

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

In testing area puf panel modified so its door was dismantle and old door was little short so making small gap that's loss of ac and increase dust so reduce gap door modified and install after that use aluminium spacer for short door gap fill.

Before Situation

In testing area puf panel modified so its door was dismantle and old door was little short so making small gap that's loss of ac and increase dust

After Situation

So reduce gap door modified and install after that use aluminium spacer for short door gap fill.

Kaizen Start Date

17-03-2023

Kaizen End Date

18-03-2023

Result

Quality

Cost Calculation Sheet
Improvement Details