Kaizen Theme
Kaizen Description

Removed the pending trolley from the line and installed a pipe to keep the pending under the line itself.

Before Situation

Earlier, to keep the pending lines, a trolley was installed behind every stage, so that if the line is pending, then the pending is kept on the trolley.

After Situation

Now we have put pipes under every stage on the lines, when the line is pending, we keep it under the line itself. and the trolley has been removed from the line

Kaizen Start Date

20-03-2023

Kaizen End Date

03-04-2023

Result