Kaizen

Back

HOD ok
by : Tilak

KPO: ok
by : Barjinder kumar

CI: ok
by :

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

Manpower cost saving

Before Situation

In model 34 Ultra we are using three part code LCD in all LCD we are pasting LCD foam and Conductive foam in one part code LCD have steel back and 2 part code LCD don't have steel back cover,.

After Situation

Now which LCD have steel back while this part code LCD will run on line in which LCD foam and Conductive foam will be not past on line due to this now we have save two manpower on line which we can use another line or can multiskilling

Kaizen Start Date

21-03-2023

Kaizen End Date

23-03-2023

Result

Moral

Cost Calculation Sheet
Improvement Details