Kaizen

Back

HOD okay
by :

KPO: ok But WIP will be only 50 for both left & right sub Assy
by : Barjinder kumar

CI: ok
by : utkersh mishra

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

Need to update Neckband N31 PLL. Because left wire housing and right wire housing have 8 and 8 stage. And during the online process, both the wires run simultaneously on the line due to which the soldering operator has difficulty in getting the wire. And there is also a line hamper.

Before Situation

During the online process, both the wires run simultaneously on the line due to which the soldering operator has difficulty in getting the wire. And there is also a line hamper.And this will not cause any manpower problem and there is no point in running left housing and right housing online

After Situation

If WIP is given at FVI assembly stage of Left Housing and Right Housing and left housing and right housing device is given at offline soldering stage then there will be no possibility of line stuck. And this will not cause any manpower problem and there is no point in running left housing and right housing online. And the plan will also be completed easily.

Kaizen Start Date

20-02-2023

Kaizen End Date

21-02-2023

Result

Quality

Cost Calculation Sheet
Improvement Details