Kaizen

Back

HOD Approved.
by : Ankur Sharma

KPO: approved
by :

CI: ok
by :

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

Before we are facing U801 PM IC (CO701112217) Part shifting issue in Model Lava Blaze_5G due to Vacuum leakage with normal nozzle due to part pick up surface is metallic. First time we are using this type of component in 5G. After Part moved from mounter 7 to 6 and add Special Nozzle with rubber tip to stable pickup position (1002 to 158) and also given detection at Pre AOI.

Before Situation

Before we are facing U801 PM IC (CO701112217) Part shifting issue in Model Lava Blaze_5G due to Vacuum leakage with normal nozzle due to part pick up surface is metallic. First time we are using this type of component in 5G.

After Situation

After Part moved from mounter 7 to 6 and add Special Nozzle with rubber tip to stable pickup position (1002 to 158) and also given detection at Pre AOI.

Kaizen Start Date

05-01-2023

Kaizen End Date

28-01-2023

Result

Quality

Cost Calculation Sheet
Improvement Details