Kaizen

Back

HOD ok
by : Manoj Kumar Satyawali

KPO: ok
by : Manoj Kumar Satyawali

CI: ok
by :

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

we have laid 2.5 Sqmm 3 Copper flexible cable in the circuit.

Before Situation

A single core wire of 1.5 sqm was laid in the underground circuit, the wire was broken at many places, thus causing tripping problem.

After Situation

we have laid 2.5 Sqmm 3 Copper flexible cable in the circuit. And tripping problem has been resolved now circuit is healthy condition.

Kaizen Start Date

01-01-2023

Kaizen End Date

01-01-2023

Result

Moral

Cost Calculation Sheet
Improvement Details