Kaizen Theme
Kaizen Description

on third floor assy line no -7 there was BOP jig concted in line power and frequently power tripping issue is coming due to leakage current passed out from Bop jig and on due to this downtime is coming on daily basis from utility account

Before Situation

on third floor assy line no -7 there was BOP jig concted in line power and frequently power tripping issue is coming due to leakage current passed out from Bop jig and on due to this downtime is coming on daily basis from utility account

After Situation

so I have provided new power supply separate from line and if BOP jig machine off/tripping due to any reason then Assy line power supply has no effect and after this work our downtime not come on this issue

Kaizen Start Date

03-12-2022

Kaizen End Date

03-12-2022

Result

Productivity

Cost Calculation Sheet
Improvement Details