Kaizen

Back

HOD ok
by : Manoj Kumar Satyawali

KPO: ok
by : Manoj Kumar Satyawali

CI: ok
by :

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

Earlier there was a lot of extra cable hole on the top of the panel which was not covered due to which any crawling could enter inside the panel due to which there could be short circuit and rat could enter inside and cut any wire. so we have cutting the GI sheet and pasted as per size and closed the hole.

Before Situation

Earlier there was a lot of extra cable hole on the top of the panel which was not covered due to which any crawling could enter inside the panel due to which there could be short circuit and rat could enter inside and cut any wire.

After Situation

After we have cutting the GI sheet and pasted on hole as per size and closed the hole.

Kaizen Start Date

02-12-2022

Kaizen End Date

02-12-2022

Result

Safety

Cost Calculation Sheet
Improvement Details