Kaizen

Back

HOD ok
by : Saba Anwar

KPO: Ok
by :

CI: ok
by : utkersh mishra

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

In model Blaze 5G modified the process of water label pasting location.

Before Situation

If water label is pasting on shield or below copper foil sticker then there is no means of water label so now water label will be paste near main camera border line of PCBA.

After Situation

Now Main PCBA water label is pasting on shield then paste copper foil on that shield and also covering water label below copper foil.

Kaizen Start Date

24-11-2022

Kaizen End Date

24-11-2022

Result

Quality

Cost Calculation Sheet
Improvement Details