Kaizen

Back

HOD ok
by : Manoj Kumar Satyawali

KPO: ok
by : Manoj Kumar Satyawali

CI: ok
by :

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

tp lcd room ahu fire damper and one toilet room supply was connected to same mcb due to which due to some electrical fault in toilet room supply was going off at all places we have to supply our toilet room now. Supply has been given through a new circuit so that the damper of LCD room and AHU room does not stop again and again, due to which the production in the power system will not stop.

Before Situation

tp lcd room ahu fire damper and one toilet room supply was connected to same mcb due to which due to some electrical fault in toilet room supply was going off at all places

After Situation

now. Supply has been given through a new circuit so that the damper of LCD room and AHU room does not stop again and again, due to which the production in the power system will not stop.

Kaizen Start Date

01-11-2022

Kaizen End Date

01-11-2022

Result

Productivity

Cost Calculation Sheet
Improvement Details