Kaizen Theme
Kaizen Description

In Nokia hope model, current test system was the bottle neck of process. By increase one system of current test, we have increase the 200 output of line.

Before Situation

In Nokia model, at current test stage we had 5 port which is neck to neck of target, we have no back system against for failure system which cause of production loss nearly 20 pcs hourly.(150 pcs per shift).

After Situation

Now increasing the one port at current test stage, we have increases the production of 200 pcs.( per shift).

Kaizen Start Date

01-11-2022

Kaizen End Date

07-11-2022

Result