In Nokia hope model, current test system was the bottle neck of process. By increase one system of current test, we have increase the 200 output of line.
In Nokia model, at current test stage we had 5 port which is neck to neck of target, we have no back system against for failure system which cause of production loss nearly 20 pcs hourly.(150 pcs per shift).
Now increasing the one port at current test stage, we have increases the production of 200 pcs.( per shift).