Kaizen

Back

HOD ok
by : Tilak

KPO: ok
by :

CI: OK
by :

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

Balance kit to be transferred at every shift end to MC01 stock from Asy01 stock after counting.

Before Situation

At present we return balance kit to MC room, where it is kept in trolley only wrapped and without any responsibility.

After Situation

If we make a system wherein the balance kit will be returned to MC room and somebody from MC team will count each and every material returned in balance kit and take them back in SAP stock in MC01 from Asy01 after every shift. In this way Reco will be matched automatically after every shift, and also the difference in any material can be ascertained after every shift. This will help in reducing the extra reco activities and also gap in each and every material and also wrong posting can be found at evry shift end, which will increase material traceability and acountability.

Kaizen Start Date

30-08-2022

Kaizen End Date

31-08-2022

Result

Productivity

Cost Calculation Sheet
Improvement Details