Kaizen Description

To prevent the battery cover assembly rejection due to Excess visible Glue

Before Situation

In battery cover assembly area, initially only 1 manpower deployed at FVI stage to check the cover visually. Observed that excess glue was present which wasn't pass and since it was dry, hence the cover had to be scrapped.

After Situation

In battery cover assembly area, initially only 1 manpower deployed at FVI stage to check the cover visually. Observed that excess glue was present which wasn't pass and since it was dry, hence the cover had to be scrapped. Now added another FVI manpower before Curing stage. Now the excess glue could be detected beforehand and the excess glue can be reworked easily in wet glue stage.

Kaizen Start Date

13-07-2022

Kaizen End Date

23-07-2022

Result

Productivity

Cost Calculation Sheet
Improvement Details