Kaizen

Back

HOD Ok
by : Ankur Sharma

KPO: OK
by :

CI: ok
by :

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

Facing bridging issue in connector

Before Situation

Model Blaze curve are facing connector shorting issue because PCB have not support at palate,during print excess and bridge issue at connector location.

After Situation

we update vacuum tooling, all location have support block for connector.

Kaizen Start Date

01-03-2024

Kaizen End Date

16-03-2024

Result

Productivity

Cost Calculation Sheet
Improvement Details