Kaizen

Back

HOD ok
by :

KPO: ok
by : Aakash Reddu

CI: ok
by :

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

To reduce the risk of Key not work issue need to add check point at Calling test stage so that double test will be performed on line.

Before Situation

At present time,key test is performed at BT test stage that is manual operation and also there is no any other check point on line for same issue.

After Situation

To reduce the risk of Key not work issue need to add check point of key test at Calling test stage so that double test will be performed on line i.e.first time check at BT test stage and second time again check at Calling test stage during calling check volume key ou and down of the device.

Kaizen Start Date

15-02-2024

Kaizen End Date

15-02-2024

Result

Productivity

Cost Calculation Sheet
Improvement Details