Kaizen

Back

HOD ok
by : Manoj Kumar Satyawali

KPO: ok
by : Manoj Kumar Satyawali

CI: ok
by :

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

At SMT line before condition Laser machine running offline this reason one extra manpower working and two table manpower working loading that reason person facing fatigue and more space using this condition. So we have applied change location Laser machine and use machine online. This work change machine direction and save space.

Before Situation

At SMT line before condition Laser machine running offline this reason one extra manpower working and two table manpower working loading that reason person facing fatigue and more space using this condition.

After Situation

So we have applied change location Laser machine and use machine online. This work change machine direction and save space.

Kaizen Start Date

03-01-2024

Kaizen End Date

04-01-2024

Result

Productivity

Cost Calculation Sheet
Improvement Details