Kaizen

Back

HOD ok
by : Manoj Kumar Satyawali

KPO: ok
by : Manoj Kumar Satyawali

CI: ok
by :

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

On 2nd floor in between smt line - 1 & 2 expansion joint sharp edge was there. There was a chance of fallen material trolley and chance of injury. Now we have changed aluminum sheet with new ms sheet and no chance of injury and material trolley fallen down.

Before Situation

On 2nd floor in between smt line - 1 & 2 expansion joint sharp edge was there. There was a chance of fallen material trolley and chance of injury.

After Situation

Now we have changed aluminum sheet with new ms sheet and no chance of injury and material trolley fallen down

Kaizen Start Date

24-12-2023

Kaizen End Date

24-12-2023

Result

Safety

Cost Calculation Sheet
Improvement Details