Earlier in FP, torch test and headphone test both was performed on same stage so that operator some time not detect torch fail handset .Now torch test performed separately in FT sequence to ensure torch is must be worked.

Before Situation

Earlier in FP torch test and headphone test both was performed on same stage so that operator some time not detect torch fail handset

After Situation

Now in FP like-A1 Josh with BOL, torch test performed separately in FT sequence to ensure torch is must be worked.

Kaizen Start Date

04-12-2023

Kaizen End Date

11-12-2023

Result

Quality