Kaizen

Back

HOD ok
by : Manoj Kumar Satyawali

KPO: ok
by : Manoj Kumar Satyawali

CI: ok
by :

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

In between assembly line 03 and 04 previous was install aluminium sheet where building expansion joint this is not heavy sheet to movement. So i am install a heavy SS sheet to heavy strength now movement is normal.

Before Situation

Between assembly line 03 and 04 previous was install aluminium sheet where building expansion joint this is not heavy sheet to movement.

After Situation

So i am install a heavy SS sheet to heavy strength now movement is normal.

Kaizen Start Date

17-11-2023

Kaizen End Date

17-11-2023

Result

Safety

Cost Calculation Sheet
Improvement Details